Happy New Year everyone!
I made good use of my Christmas break (the company I work for closes between Christmas and New Year) and got a huge amount done on the tiny house!
I started out making the door and window frames. All of these were made from timber from the sawmill, which required cutting & planing. The sills also required a groove to be cut on the outside edge, to act as a ‘drip lip’. Everything is pine, except the door sill, for which I used Oak, as it will be much harder wearing, and will match the flooring. I’ve used linseed oil as treatment again!
Unfortunately I ran out of timber for the window frames, so the windows in the bay only have a sill and the top part of the frame…

Once I had the window frames in, I could make a start on the interior cladding. Again I’m using pine tongue and groove cladding, and using more sheep’s wool insulation.


In order to complete some of the walls, I’ve also had to work out where all of the electrical sockets need to go, and run all of the wiring inside the walls. There’s a fair bit more than a ‘normal’ house – being an off-grid system there’s additional feeds for DC power for smaller loads, and I’m adding data cabling for control of various devices such as inverters and water pumps. And a huge bundle of cables for all of the solar panels!
All of the cables run to the under-floor storage area at the east end (the end with the bay window and door) – I’ll be using this storage for the batteries & electrical system.

After running the wires, I could now fit some more of the insulation and tongue and groove cladding.


I still have more wiring and cladding to do, I haven’t made a start on the east end yet as I still need to work out where I need various sockets and switches – all based around the workbench. And I haven’t even decided how high the workbench is going to be – I want all of the sockets to be underneath, with cable management covers to hide all with wires!
I will have to remove some section under the kitchen window to fit the gas pipe for the cooker. I should have thought ahead and ordered the fittings weeks ago…